Home » Uncategorized » Southwest Fox 2009: Preparation Days
Nov
22

The preparation to make the trip to Phoenix is always jammed packed with last minute details. The 2009 conference was our third time putting on the show so one would think things would become some what automatic. In some cases it is and in some cases it is not as we try to change things up a little based on feedback and our own ideas. This year my check list seemed longer than normal, but I realized I was just busier than normal with the White Light Computing workload.

Northwest changed our booked flight just before the conference and the flight time really put a crimp into the planned schedule based on a tight schedule once we hit Phoenix. I called Northwest and got Therese and I on an earlier flight, but this meant getting up a few of hours early (1:30am Arizona Time). We carry a lot of the conference materials in our carry-ons because we want to ensure all the really important things make it to Mesa. This means lots of luggage. The flight to Phoenix started out with a 75 minute delay in Detroit. The air conditioning on the plane was not working because one of the problems was getting power working at the gate. I believe Northwest was just preparing us for the Arizona weather by heating up the plane to 85F. The delay forced us to figure out a new schedule once we hit the ground.

Once in Phoenix we got our luggage, picked up the rental car, found Doug searching for his luggage, and rushed to pick up the conference t-shirts, speaker shirts, and conference bags. Direct to the conference hotel to check in, drop everything off and head back to the airport to pick up Tamar and Marshal. Believe it or not, we were only a little behind considering the delays in Detroit. Last stop before heading back to the conference center is to pick up the room schedule posters we get printed out.

Dinner at the Cheesecake Factory Tuesday night was a nice reward at the end of a long day. Tuesday night only has two scheduled tasks. The first was to take delivery of all the shipped materials, inventory the items, and check to see nothing got broken. The second task was to get a full night of sleep because it is the only night in Mesa that happens.

Wednesday morning I was up bright and early. This works well for me as I can get some email and work handled before we jump into official conference mode. I also took a quick walk around the golf course to enjoy the warm weather. After breakfast we have a meeting with the conference center staff. We literally walk though the schedule of each day we are on site so everyone understands what is going to happen and when it is going to happen. The staff at the Arizona Golf Resort and Conference Center are terrific.

After the meeting we begin the assembly of the conference bags. New idea this year was to literally build the bags for each individual. The last two years we built generic bags and customized them as people checked in. This was a brilliant idea as it really simplified the registration process and reduced the number of people we needed to have at the registration desk.

Several other things happen on Wednesday. The conference center transforms the ballroom into the four session rooms by assembling the four 12 foot screens. This year there was a mix-up with the screens and we had to have them swapped out between the pre-conference sessions and the Keynote. The projectors arrive and need to be set up and tested. The conference bags get moved over to the registration desk. Many of the speakers arrive on Wednesday so Therese was making continuous runs to the airport to pick each of them up. She also picked up the Ceil Silver Ambassador Emerson Santon Reed early in the day. It really is a busy day. We ended it by going out to dinner at PF Changs. Dinner was awesome, but paled in comparison to the excellent discussions with everyone and getting to know Emerson a little bit before the conference.

, ,

Add reply